{"id":211,"date":"2020-05-26T21:24:19","date_gmt":"2020-05-27T04:24:19","guid":{"rendered":"http:\/\/www.jessesrv7a.com\/?p=211"},"modified":"2020-06-11T15:29:59","modified_gmt":"2020-06-11T22:29:59","slug":"beginning-horizontal-stabilizer-days-1-3","status":"publish","type":"post","link":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/beginning-horizontal-stabilizer-days-1-3\/","title":{"rendered":"Beginning Horizontal Stabilizer, Days 1-3"},"content":{"rendered":"\n<p>With my shop all setup, most of the needed tools acquired and parts ready to go, it was time to start building!<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200520_223141-1024x576.jpg\" alt=\"\" class=\"wp-image-212\" srcset=\"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_223141-1024x576.jpg 1024w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_223141-300x169.jpg 300w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_223141-768x432.jpg 768w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_223141-1536x864.jpg 1536w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_223141-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Day 1 <\/strong><em>(5\/23\/20)<\/em><strong>: Horizontal Stabilizer, Rear Spar Assembly<\/strong><\/p>\n\n\n\n<p>The first parts I needed were the two HS-609PP reinforcement bars and two HS-603PP spar channels. After breaking their edges, I laid the HS-609PP&#8217;s into the spar channels, roughly aligning the pre-drilled holes to visually gauge if the bottom surfaces of the -609&#8217;s laid flat on the -603&#8217;s. The flange radius on the spar channels tend to prevent the -609&#8217;s from laying flat, as they did in my case. I used a Vixen file to carefully remove material from the pertinent edges of the -609&#8217;s until they fit flat.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200520_233149-1024x576.jpg\" alt=\"\" class=\"wp-image-213\" srcset=\"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_233149-1024x576.jpg 1024w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_233149-300x169.jpg 300w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_233149-768x432.jpg 768w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_233149-1536x864.jpg 1536w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200520_233149.jpg 2013w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>D<strong>ay 2 <\/strong><em>(5\/24\/20)<\/em><strong>:<\/strong><\/p>\n\n\n\n<p>I finished fitting the -609&#8217;s to sit flat. Next, I rounded the noses of the -609&#8217;s per instructions, creating about a 1\/4&#8243; radius on each corner. To do this, I used my new 6&#8243; 7A Scotch-Brite wheel.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200523_162411-1024x576.jpg\" alt=\"\" data-id=\"216\" data-full-url=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200523_162411.jpg\" data-link=\"http:\/\/www.jessesrv7a.com\/?attachment_id=216\" class=\"wp-image-216\" srcset=\"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_162411-1024x576.jpg 1024w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_162411-300x169.jpg 300w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_162411-768x432.jpg 768w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_162411-1536x864.jpg 1536w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_162411-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"blocks-gallery-item__caption\">Creating the rounded corners. The one side could use a little more rounding.<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200523_135247-1024x576.jpg\" alt=\"\" data-id=\"214\" data-full-url=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200523_135247.jpg\" data-link=\"http:\/\/www.jessesrv7a.com\/?attachment_id=214\" class=\"wp-image-214\" srcset=\"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_135247-1024x576.jpg 1024w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_135247-300x169.jpg 300w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_135247-768x432.jpg 768w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_135247-1536x864.jpg 1536w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_135247-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"blocks-gallery-item__caption\">6&#8243; 7A Scotch-Brite wheel with my custom 3d printed 1&#8243; to 5\/8&#8243; adapter<\/figcaption><\/figure><\/li><\/ul><\/figure>\n\n\n\n<p>All surfaces of the -609&#8217;s need to be smoothed to a 400 grit-like finish, removing all milling marks and scratches. For the most part I did this by hand with 220 and 400 grit sandpaper, and maroon Scotch-Brite pad. I did use a 1&#8243; Scotch-Brite wheel on a die-grinder for the more stubborn marks. Overall the finish came out pretty nice! On Day 2 I finished one -609.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200523_221551-1024x576.jpg\" alt=\"\" class=\"wp-image-217\" srcset=\"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_221551-1024x576.jpg 1024w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_221551-300x169.jpg 300w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_221551-768x432.jpg 768w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_221551-1536x864.jpg 1536w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200523_221551-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Day 3 <\/strong><em>(5\/25\/20)<\/em><strong>:<\/strong><\/p>\n\n\n\n<p>Finished smoothing second -609. Clecoed -609&#8217;s into -603&#8217;s. I reamed the attachment holes to #30. Next, I marked the 8th holes from the ends to be drilled to size #21.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200524_184251-1024x576.jpg\" alt=\"\" class=\"wp-image-219\" srcset=\"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200524_184251-1024x576.jpg 1024w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200524_184251-300x169.jpg 300w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200524_184251-768x432.jpg 768w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200524_184251-1536x864.jpg 1536w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200524_184251.jpg 1948w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The two HS-412PP&#8217;s and two HS-413PP&#8217;s were found, which I positioned the left side parts and match-drilled using #30 reamer. I had to stop here as I ran out of 1\/8&#8243; Clecos. I know, such a rookie mistake! Backup is on the way.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/www.jessesrv7a.com\/wp-content\/uploads\/2020\/05\/20200525_200924-1024x576.jpg\" alt=\"\" class=\"wp-image-220\" srcset=\"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200525_200924-1024x576.jpg 1024w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200525_200924-300x169.jpg 300w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200525_200924-768x432.jpg 768w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200525_200924-1536x864.jpg 1536w, https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-content\/uploads\/2020\/05\/20200525_200924-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>With my shop all setup, most of the needed tools acquired and parts ready to go, it was time to<\/p>\n","protected":false},"author":1,"featured_media":218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/posts\/211"}],"collection":[{"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/comments?post=211"}],"version-history":[{"count":4,"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/posts\/211\/revisions"}],"predecessor-version":[{"id":224,"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/posts\/211\/revisions\/224"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/media\/218"}],"wp:attachment":[{"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/media?parent=211"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/categories?post=211"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nuclearprojects.com\/jessesrv7a\/wp-json\/wp\/v2\/tags?post=211"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}